Iron Furnace Manufacturing Steps in ERPNext
By creating a detailed workflow that corresponds to the actual manufacturing processes, ERPNext can effectively model the Iron Furnace Heat Treatment Manufacturing Process. Here's how to put it into practice:

1. Setup: Prerequisites in ERPNext
Before starting the process, configure the following modules:
- Items: Create items for raw materials (e.g., iron, furnace fuel, coolant) and finished goods.
- Bill of Materials (BOM): Define BOM for each product, including required materials, operations, and costs.
- Workstations: Set up workstations (e.g., Furnace Station, Cooling Station, Inspection Station).
- Operations: Define each operation in the manufacturing process.
- Routing: Specify the sequence of operations for heat treatment.
- Work Orders: Enable manufacturing using work orders.
2. Manufacturing Workflow: Step-by-Step
Before starting the process, configure the following modules:
Step 1: Material Request
- Process: Create a Material Request for raw materials needed for the heat treatment.
- Module: Stock > Material Request
- Action: Approve and convert the Material Request to a Purchase Order, if materials are not in stock.
Step 2: Stock Entry for Raw Materials
- Process: Receive raw materials into the warehouse.
- Module: Stock > Stock Entry (Material Receipt)
- Action: Verify and accept received items.
Step 3: Create a Work Order
- Process: Generate a Work Order for the heat treatment process.
- Module: Manufacturing > Work Order
- Details
- Select the finished good
- Link the BOM.
- Specify the quantity to produce.
- Action: Submit the Work Order to begin the process.
Step 4: Start Production
- Operation 1: Pre-Heating
- Workstation: Pre-Heating Station
- Description: Heat the raw iron to a predefined temperature.
- Action: Record the completion of the operation.
- Operation 2: Furnace Heating
- Workstation: Furnace Station
- Description: Heat treat the iron in the furnace at a specified temperature for a defined duration.
- Action: Enter details such as:
- Furnace temperature.
- Duration of heating.
- Fuel consumption (if any).
Step 5: Quality Inspection
- Process: Perform a Quality Inspection on the treated material.
- Module: Quality > Quality Inspection
- Action: Approve or reject based on:
- Hardness test.
- Surface finish test.
- Dimensional accuracy.
Step 6: Transfer to Finished Goods Warehouse
- Process: Perform a Stock Entry to move treated materials to the Finished Goods warehouse.
- Module: Stock > Stock Entry (Material Transfer)
- Action: Update stock levels for finished goods.
Step 7: Sales Order Processing (Optional)
- Process: Handle customer orders for the heat-treated material.
- Module: Sales > Sales Order
- Action: Reserve or dispatch finished goods as per the order.
3. Reports and Analytics
Use ERPNext’s reporting tools to track:
- Production Efficiency: Manufacturing > Reports > Production Analytics
- Material Consumption: Stock > Reports > Stock Ledger
- Quality Performance: Quality > Reports > Inspection Report
- Costing: Manufacturing > Reports > BOM Costing
Solution Architecture
Data Analysis
How can we help you?
Contact us at the Consulting WP office nearest to you or submit a business inquiry online.
Benefits
This workflow can be customized further based on specific business needs, additional quality checks, or regulatory compliance requirements.